Commercial Refurbishment, Northamptonshire 

Project Details 
 
The property was full of boxes, paperwork, filling cabinets and computers through the whole building.  
 
Once planning permission was granted all items had to be removed along with the fabricated walls. The whole interior was dismanteled. 
 
The plan for the property was to fit a gym with shower facilities that spanned the entire ground floor. 
 
The first floor needed to be reconfigured into 10 serviced offices ranging between 10 and 18 square meters with a meeting room, kitchen and toilet facilities and a working reception area. 
 
The finished product was so good we decided to stay! 
 
 
Timescale 4 - 6 Week 
 
 
 
 
 
 
 
 
 
 
 
For more information simply call us on 01536 333545 or Email info@3ehub.co.uk 